System Testing for the Automation of the Automobile Workshop in Automobile Industry
DOI:
https://doi.org/10.37628/ijosct.v2i2.170Abstract
Here the System testing involved is the most widely used testing process consisting of five stages as shown in the figure. In general, the sequence of testing activities is component testing, integration testing, and then user testing. However, as defects are discovered at any one stage, they require program modifications to correct them and this may require other stages in the testing process to be repeated.Downloads